Storstrom Bridge Falster-Masnedo (DK): Project Management
Project Manager activity in the design of Landworks for the Storstrom Bridge Project.
Storstrom Bridge Falster-Masnedo (DK): Site Camp
Analysis of daylight natural lighting inside the prefabrication sheds called 2, 3, 4, 5, 6 and 7 of the site camp, in the various seasons of the year according to the aero-illuminating ratio.
Realization of three-dimensional models with BIM methodology – Building Information Modeling of warehouses.
Storstrom Bridge Falster-Masnedo (DK): Site Camp
3D modeling of the external systems of the Site camp and of the internal systems of the prefabrication sheds named 2, 3, 4, 5, 6 and 7.
Realization of the 3D model of all the plants outside the sheds of the Site Camp and the 3D model of the main distribution inside the sheds, with LOD200, aimed at coordinating any interference between the plant networks; coordinating the plant networks with reinforced concrete structures.
Storstrom Bridge Falster-Masnedo (DK): Landworks and marineworks
Support for the design of Design Packages related to Landworks in Falster and Masnedo, Marineworks, Ancillary works of the bridge, Slab Track.